MartinLogan Ticket Spécifications Page 4

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 3
Required tools (included):
4mm Allen bit
(2) Push pins
Required tools (not included):
Stud finder
Sharp pencil or pen
Level
Dry wall knife/saw
Wire strippers
Electric drill (with clutch)
Tape measure
Depth required behind wall surface:
3
3
/16" (8.1cm)
Required
wall opening (includes tolerance):
7
1
/2" x 22
15
/16" (19.1cm x 58.3cm)
4 Installation
Figure 4. Top view.
Figure 3. Side view.
Figure 2. The Passage is designed to mount anywhere between studs.
Vue de la page 3
1 2 3 4 5 6 7 8 9 ... 15 16

Commentaires sur ces manuels

Pas de commentaire